Project
Escuela/Decanato
Description
Status
Completion Date
Inter-building pedestrian bridges
Administration
Pending to begin repairing the bridge in front of the Student Center.
Pending Funds
Pending
Second phase PPDI Dentistry- Space improvements
Dental
Creation of space for Intramural Practice of the School of Dental Medicine to meet the standards and that students have more opportunities to practice.
Permisology
April 2021
Animal House Extraction System, Institute of Neurobiology
Neurobiology
Replacement Extraction System.
Under construction
October 2021
Library improvements, floor 4
Academic Affairs
Improvements for Study spaces on the 4th floor of the Library
Completed Construction 100% Pending Teams
Pending
External Repair of Dr. Guillermo Arbona Irizarry Building
Rectory
Patching of Walls and Application of paint in all Buildings of the Campus. The second EPS Building Phase began.
Under Construction
October 2021
Acquisition of laboratory furniture and infrastructure connections on the third floor (spaces 326 and 327), School of Pharmacy
Pharmacy
Enabling Research Laboratory, School of Pharmacy, Medical Sciences Campus.
Design 90%
June 2021
Santiago Isern- Punta Santiago School Rehabilitation in Humacao
Primates
Laboratory Air Conditioning System Improvements.
In Design
April 2021
Puerto Rico Center for Environmental Neuroscience Hurricane Maria's Grant
Neurobiology
Various Improvement Projects
Design 65%
June 2023
Conventional Veterinary Clinic Air Conditioning System
Primates
Air Conditioning System Improvements.
Design 90%
June 2021
Necropsy Laboratory Improvements
Primates
Physical Improvements Laboratory.
Design 90%
June 2021
Endowment Center for Health Services Research (Dr. Guillermo Arbona Irizarry Building)
Dotal/Rise
Rehabilitation of Offices of the Endowment Research Center due to Hurricane María damage.
Auction
June 2021
Cayo Santiago Station
Primates
Cayo Santiago Station Rehabilitation.
Design 90%
June 2021
Rehabilitation of the Sabana Seca Station
Primates
Rehabilitation of the Sabana Seca Station.
Design 90%
June 2021
Caribbean Primates Center
Primates
Corral 19 Construction.
Permisology
June 2021
Computer Center Relocation
Rectory
Mobilization and Rehabilitation of Room Servers.
Pending
Pending
Relocation of Dean of Students
Administration/Rectory
Student Deanship Mitigation and Mobilization.
Design 5%
May 2021
Refurbishment of Basement Spaces AB Main Building
Dental
Refurbishment for Research Areas and Study Areas for Students.
Design 90%
May 2021
Mitigation of Spaces A999, A999B & A999B
Medicine
Refurbishment of Psychiatric Office Areas.
Under Construction
June 2021
PhotoVoltaic System Cayo Santiago Humacao
Primates
Installation of the OFF Grid PhotoVoltaic System with 25kW Batteries.
Pending to Auction
September 2021
Completed Project
Escuela/Decanato
Description
Completion Date
Amendment of the Don Juan contract for the use of space in the Student Building

V
Rectory
New area for concessionaire Don Juan, this seeks to reduce the waiting time in the lunch hours to our public: whether students, employees and visitors. Also, have an area where you can buy products to promote our Campus.
February 2021
Improvement of spaces A707 and A7-8 Research and Contracts
CRECED
Improvements to the Research Office and Contract Office
October 2020
Replacement of Lumber Divisions and Maintenance Repairs for ADA Compliance
Dental
Replacement of Wood Divisions to increase the capacity of dental chairs.
January 2020
Central Air Conditioning System, Institute of Neurobiology
Neurobiology
Making connections. Pending additional funding for hidden issues.
June 2020
Caribbean Primates Center
Primates
Repavimentation Primate Center.
September 2020
Temporary waterproofing of RCM roofs
Rectory
Temporary Roof Waterproofing.
December 2020
External Repair Dr. Guillermo Arbona Irizarry Building Pharmacy Building, ACTU / CEMI, Jaime Benitez Amphitheater
Rectory
Patching of Walls and Application of paint in all Buildings of the Campus.
July 2020
Repair of panoramic elevators
Administration
In this project, the elevators will be modernized by replacing machines, fixing the cabin, adding an anti-earthquake system and other controls to comply with the elevator standards that exist in Puerto Rico.
October 2020
Mitigation of spaces B465 to B473
Public Health
Mitigation of spaces B465 to B473 of the Offices of the Institute for Deficiencies in Development
October 2020
Caribbean Primates Center
Primates
Construction of 14 SPF cages.
October 2020
CLEAN ROOM ISO 7
Medicine
Preparation/Construction Cleanroom ISO 7 of Negative and Positive Pressures in Pharmacy Research of ACTU/CEMI.
January 2021
Central Elevators Main Building Dr. Guillermo Arbona
Administration/Rectory
Interior Cabin Modernization
February 2021